Wuhan Fengfan Trading Co., Ltd.
Main products:SSO3,TC-BAR,PS,PPS,PUB
Products
Contact Us
  • Contact Person : Ms. Wang Helen
  • Company Name : Wuhan Fengfan Trading Co., Ltd.
  • Tel : 86-27-85615903-8010
  • Fax : 86-27-83566215
  • Address : Hubei,Wuhan,2F,Special No.8 LingJiaoHu Rd., Hankou, Wuhan 430015, P.R.China
  • Country/Region : China
  • Zip : 430015

SZ-75 Sulfate Zinc Plating for Steel Wire

SZ-75 Sulfate Zinc Plating for Steel Wire
Product Detailed
Good combination between plating deposit and steel wire, low brittleness, zinc loss lower to 2~8% during drawing.

1.     Good combination between plating deposit and steel wire, low brittleness, zinc loss lower to 2~8% during drawing. 

2.     The deposit thickness is up to 50~200g/m  , suitable for continuous zinc plating on general steel, mid- and high-carbon 

steel wire, also for wire drawing and deeply processing of the plating deposit. 

3.     The  bath  allows  wide  range  of  temperature,  it  has  good  salt  resistance,  no  foam,  stable  bath  is  easy  to  operate  and 

maintain. 

BATH COMPOSITION & OPERATION CONDITION 

Zinc sulfate (ZnSO  4⋅7H 

 

600~700g/L

 

2O) 

 

25~30ml/L

 

SZ-75 Bath make-up 

 

16~18ml/L 

 

SZ-75 Additive 

 

2.5~3.5 

 

PH 

 

10~60°C

 

Temp. 

 

40~70A/dm 

 

D    (continuous running) 

 

>95%

ATTENTION 

1.     When making up bath, use warm water to dissolve zinc Sulfate (ZnSO 4⋅7H  2O) and remove sediment, then add SZ-75 

additive and bath make-up agent, stir it and filter, then use. 

2.     Steel wires must be treated completely before being plated, ensure them no rust or black ash, If the bath is circularly 

filtered, the effect will be better. 

3.     Analyze the solution concentration periodically, If no analysis, its Beaume degree should be controlled over 30°. 

4.     The  additive  consumption  is  40~60ml/KAH.  Generally,  producing  1MT  of  wire  need  to  replenish  2000~2500ml  of 

additive. 

5.     SZ-75 bath make-up agent should be replenished periodically because of drag-out loss, its consumption is 20ml/KAH. 

6.     The other salt, such as Na 2SO4 and Al 2(SO 4  3)   etc., are not permitted to add into bath, 

SZ-75 Sulfate Zinc Plating for Steel Wire



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.